MFDA can assist you in developing an OQ utility validation
protocols tailored to your specific utility system.
The contents of a typical procedure may include, among
others, the following sections:
1. Protocol Approval Page
2. Table of Contents
3. Purpose
4. Scope
5. Responsibilities
6. System Description
a. Major Component Parts
b. Water Flow Path Through System
c. Alarms and Controls
7. References (Drawings, etc.)
8. Standard Operating Procedures
9. Instrument Calibration Review
a. Test Instruments
b. Process-Related Instruments
10. Listing of Key Operating Parameters
11. Functional Testing of Key Operating Parameters
12. Acceptance Criteria Summary
13. Protocol Summary Report
14. Protocol Deviations and Corrective Actions
15. Protocol Document Requirements (Attachments)