| MFDA can assist you in developing a Facility Installation Qualification protocol tailored to your specific facility requirements. The contents of a typical procedure may include, among others, the following sections: 1. Protocol Approval Page 2. Table of Contents 3. Purpose 4. Scope 5. Responsibilities 6. Facility Description a. Room Description b. Room Numbers c. Classifications 7. References (Drawings, etc.) 8. Standard Operating Procedures 9. Instrument Calibration Review 10. Facility Room Inspection Check List (materials of construction and finishes) 11. Room Inspection Testing a. Noise Levels b. Light Intensity Levels 12. Drawing Reviews 13. Acceptance Criteria Summary 14. Protocol Summary Report 15. Protocol Deviations and Corrective Actions 16. Protocol Document Requirements (Attachments) |
||||